Temps in low 30's, but we got some heat and worked on the insulation for the roof area.
The board is the carsiding put up to see how it would look.
Photo blog of a cabin remodel located in northern Michigan.

Quick trip to the cabin to work on the leaves. We took a truck load out to the compost center. Leaves on the one side of the cabin I raked into my garden spot and will use them as compost for the garden. Other side of house was not raked, we hope the wind blows them into the backyard.
Well, the weather is a changing. We had a blast this year even if it was a bit rough. Emily and I finished the sub-floor Saturday and spent time cleaning up the mess. We hauled 3 big bags of creosote home for the dumpster and some of the larger pieces of junk. Next year all that will be gone!! The front half of the building still needs to be stripped but it will wait till we get the back half started and the bathroom started.
Busy weekend, beautful weather, Ben figured out how to spend Sunday after lunch......
Here's the Saturday work all finished up. And yes, the door frame is level...... This is the first new thing installed on the cabin, demolition is just about all done. We got the front of the cabin to finish up, but the back 2/3rds is go for remodel.
Sunday, me and Maria worked in slow gear, removing the ugly OSB covering the old shower access and fitting in siding to fill in the hole. The "experts" used a chainsaw to make the hole originally. Sheesh......