We had planned a big push on the demolition for the 18th. Just about everything got in the way of that plan so we scaled down to working on the chimney as it was not going to be needed.
Anyways, after removing the top part we worked on the inner part with some unexpected results. Apparently, the floor joists are set 24 inches or more apart......

The roof was shingled over the hole so that is now water tight, unlike with the chimney.