Sunday, October 11, 2009

Well, the weather is a changing. We had a blast this year even if it was a bit rough. Emily and I finished the sub-floor Saturday and spent time cleaning up the mess. We hauled 3 big bags of creosote home for the dumpster and some of the larger pieces of junk. Next year all that will be gone!! The front half of the building still needs to be stripped but it will wait till we get the back half started and the bathroom started.

I will probably still go up north this winter but work projects will be limited to insulating the roof areas and possibly starting the floor work for the laying tile in the living areas. I expect temps will be a big negative, but just being there helps clear my head. We need to do something that makes big heat to use it during the winter.

Monday, October 5, 2009

October 2nd

Worked on putting sub floor in. Kathy and Josh helped for a couple of hours. We got 4-5 sheets to go to cover the back 2/3rds of the house.

Stupid power supply failure caused me to not be able to work on Sunday so no pictures.

Architect has plans completed, pretty close to what we want the place to look like. I need to scan them to post them.

Monday, September 21, 2009

Sept. 20 work weekend

Busy weekend, beautful weather, Ben figured out how to spend Sunday after lunch......
Here's the Saturday work all finished up. And yes, the door frame is level...... This is the first new thing installed on the cabin, demolition is just about all done. We got the front of the cabin to finish up, but the back 2/3rds is go for remodel.
Sunday, me and Maria worked in slow gear, removing the ugly OSB covering the old shower access and fitting in siding to fill in the hole. The "experts" used a chainsaw to make the hole originally. Sheesh......

We also plugged the hole in the sewer line which is in the ground in the bottom pix. Used to be an old vent pipe there that was just sitting on the pipe, not screwed in, and had filled with dirt and rocks. We ran the water pump to wash it out and hopefully keep it clean , but our pump is not making a very high amount of water pressure...

I got like 10-12 spider bites on my backside which I can only guess is they are in my chair!!! Raid on order list!!!! I had planned on installing sub-floor but pulled my neck-shoulder out on the door so heaving around big sheets of wood fell off the list.

Sunday, September 6, 2009

Labor Day work party



Well Labor Day is here, summer is winding down. Maybe the mosquitoes will go south soon.

We finally got the ugly walls down, took two work days to do it too....


This roof tie will probably stay and will become a solid looking beam. Basically we got 2/3rds of the cabin ready to now begin working on it. We will start with the back wall windows and door. First thing is the floor needs to be laid down, the subfloor is very bouncy, just ask Ben. Our other major project is the bathroom which is ready for work too. We need to brace the wall and then cut out the bad rotted stuff and replace it. The one end needs some masonry work as the blocks have become loose from the wall.

Monday, August 31, 2009

August 31st workcrew



This is the new improved open back area. No more walls and parts of walls any more. The wall to the right is ready to come down once we cut it free.






Yeah this is the "bathroom" area and the wall was full of wood shavings/sawdust as insulation. Also, Josh broke another sledge hammer.

Saturday, August 8, 2009

Camp Bear-Buck 2009


Welcome to Camp Bear-Buck!!!!! It's the 2009 camping trip and we are , yes we are, live-blogging from the camp!!!!! We got no "toilet", but we got broadband.

Arrived Friday late, tired , stressed out... We popped a screen over the old window and got it open to catch the lake breeze. Kinda muggy but by 11 it was a cool breeze so much I cut the opening by half.

We popped out our remote surfing tools and lo and behold, thar be broadband out there and it's wide open.



In the pix, there is a small blue light on the wall, that is our repeater-booster that has a connection. Kids now know the phrase, " Two blue good, red-blue bad". Apparently , our friends are connected to Charter cable and we got zippy conections. I know who has the link, so I will go buy something from them.


On Saturday, we had the "pot-o-coffee" then fired up our camp stove for breakfast.

Menu:

Pancakes with blueberries ( not "sauce" like some resturants fake)

Farm Milk

Farm Eggs

Juice


More info later, it's raining hard right now, so we are sitting tight.

Monday, July 20, 2009

Flannel in July??? Why yes, yes it was cold



I'm sitting on the porch , it's raining ( more like a mist) and about 50 degrees. Flannel all around, didn't even break a sweat working...
And yes, I looked a little pissed, more like stressed out.


What else do you do on a rain day? That's the venerable Lay-z-boy chair now doing cabin duty.


Here is a depiction of the rear wall plans spray painted to help show where it goes from the plans. The white object is Maria's emergency potty, no more messes.....

Once home we discovered that Maria likes to play in the dirt...