Monday, June 29, 2009

June 28th workout

The wee one running in the woods























Rotten part of wall and floor removed.




10 foot rim joist and sill plate removed due to rot. Door removed and wall put back in with OSB for outer skin. I forgot to take the all done picture.

Sunday, June 7, 2009

May 31st work

Image of how new roof will look.






We are stalled till we get "plans" and something called a "permit" before we can "repair " the obvious damage to the building.







Should look nice once the pitched roof is popped into place.

Kids were a big help, they like going to the cabin.
This is the well and well, it is a mess. Oh of course the pump was split in half because it froze. We need to rip all this out.