Sunday, October 11, 2009

Well, the weather is a changing. We had a blast this year even if it was a bit rough. Emily and I finished the sub-floor Saturday and spent time cleaning up the mess. We hauled 3 big bags of creosote home for the dumpster and some of the larger pieces of junk. Next year all that will be gone!! The front half of the building still needs to be stripped but it will wait till we get the back half started and the bathroom started.

I will probably still go up north this winter but work projects will be limited to insulating the roof areas and possibly starting the floor work for the laying tile in the living areas. I expect temps will be a big negative, but just being there helps clear my head. We need to do something that makes big heat to use it during the winter.

Monday, October 5, 2009

October 2nd

Worked on putting sub floor in. Kathy and Josh helped for a couple of hours. We got 4-5 sheets to go to cover the back 2/3rds of the house.

Stupid power supply failure caused me to not be able to work on Sunday so no pictures.

Architect has plans completed, pretty close to what we want the place to look like. I need to scan them to post them.