The bracket for the chimney was installed and the 2nd floor window got replaced. Now I need a day off to recover from all the driving and silliness.

Photo blog of a cabin remodel located in northern Michigan.
Labor Day was a short weekend but had a good time camping out , first good cool day for quite some time. Installed the cement board where the woodstove will be installed in the living room.
Also worked on loft area, installed the remaining 2x6's for the front of the loft then put in the cross bracing and loaded up two sheets of OSB flooring.
This is the upper window known as the "raccoon window". It will be replaced on the next work weekend.