July 18th and 19th work progressed really well. There was a really nice nap on the 18th and rain storms to sit and listen too in the cabin. Very relaxing....


We got the floor done on Sunday . Toilet is just sitting there for looks.



On Monday, our Jr. Plumber came in and set the toilet flange ( oh I know it's called a "water closet") .

I was asked to provide a little more weight to set the wax ring on the water closet. The unit was tested and no water leaks!! Good flush too...



On Monday we built the window frame and installed the new window, boxed up the old window space, and then began prepping the wall for siding. The tar paper will come off once we seal the frame around the window, did not want rain or bugs getting in. We will cut the bottom off the tuff-r and 1 by trim pieces for the bottom edge on the wall. I tacked up two pieces of the cement board to see how they look on the wall.
Finished wall. new window, and working toilet.