Monday, May 30, 2011

Memorial Day 2011




Four Days of relaxation at the cabin. Wow what a nice time. Weather was a mixed bag, cold, rain, hot, sunny. Typical Michigan I guess. We got the woodstove working and had two fires in it, one for testing, and one because it was in the upper 40's on Saturday. We also found we can cook on the top and so we made fresh rolls and heated up our brats and sausages.

Lot of work got done, not too many pictures though. The stairway was framed in and we hung 3 of the 4 sheets of drywall inside the stairway. Next is the stringers and steps up to the loft. We framed in the wall-hallway section- pretty time intensive with all the angles and such involved.

Emily helped with the tree fort and the picture shows up putting the initial flooring. Next step is rest of flooring and then the railing so kids can play on it.

Pretty mellow time.

No comments:

Post a Comment