Tuesday, July 5, 2011

July fourth weekend




Well July 4th was a blast weekend, even had local fireworks!!!! (iykwim)....lol

Most of the time spent in construction was laying 6 sheets of OSB on the floor joists for the loft. Hotter then the sauna back home for 3 days. We got 6 more to finish the loft flooring to go.

The picture is the "trial-run" ceiling fan to make sure the blades have plenty of clearance to the roof line. BAsically it hangs down 36 inches fromt he ceiling and can have a 52 to 66 inch total blade length. Should provide a good amount of air movement in the house. We will also have fans in the two bedrooms to help move air around, really trying to not install air conditioning.

Spent about 500 bucks on wiring and such, getting ready to run outside walls electrical so insulation can get started. Cabin needs insulation so we can work all winter and not freeze like years past.

No comments:

Post a Comment