Sunday, August 28, 2011

August 27-28th Summer is fading fast

Three day "vacation" and while still warm, weather was really nice in the morning and evening. The main project was getting the flooring installed in the great room. We had 3 cases and then ended up buying three more to get the floor mostly covered, still need to work on the area around the stove and then we continue down the hall to the front door. That will take 6 feet x 20 feet of tile to complete.

Kids took this picture instead of the electrical work we worked on Sunday. Switches for hall lights, east wall and outdoors was run. We have switches to add in next time. It is possible to have hall lights, bathroom and east wall electrical outlets done on next trip. A small trip under the house will be required. Guess who gets to go?




No comments:

Post a Comment