Sunday, September 23, 2012

cooking with gas!!!!

Well kinda. First weekend of Fall 2012 and it felt like winter was coming fast. Had every inclination to finish the remaining siding pieces and put that project to sleep till Spring but every time we went outside, it rained. So working inside became a massive electrical work day for us. We dropped in 7 circuits into the crawl space and I got elected to go down inside. After an hour of crawling around the lines were run from the box to their prospective locations. This included the oven circuit.

Took two trips to get the correct breakers and fuses for the disconnect. We also installed 2 4 foot heater units in the bedroom and hallway. This was noticeable to me the next morning as temps were barely 40 degrees. Inside the house we maintained 64 degrees the entire weekend. We only used the woodstove on Friday night to get temps up where they needed to be.

We added a heater unit to the pumphouse and so we will try to keep the water on till end of October. No sense chancing it after that.

No comments:

Post a Comment