Monday, June 20, 2011

window weekend June 19th


Amazing what can get done with a little effort. We finished all the window replacements. This picture is after finishing the upper windows ( picture order is backwards). This was the hardest to do window as it was all ladder and scaffold work and the kids wanted to see what we did up high.




Emily was in charge of pictures and only took like 10 to get this shot.




Finished product for the weekend., Ignore the scrap pile and junk, dumpster coming soon!!! All we need is the door to go in on the left side of wall and then can start siding.






The last window. Takes the boarded up look away and really helps light up the cabin. This wall will be first one sided.






Monday, June 13, 2011

Weekend of June 12th - red flannel alert!!


Well good thing we got the woodstove, had 4 fires in it over the weekend to warm up the place. Temps earlier in week were in 90's but weekend kept drifting into low 50's /40's and solid breezes off lake kept it cool. Breeze helped keep mosquitoes at bay too!!

Not much work, seems we forgot the framing square so cannot layout stair stringer without it. Installed small window in maintenace area of cabin and it has a good view of road. Took measurements for roof and to start siding outside of house.

Early Sunday coffee drinkers got to see two deer walk in and sample the bird feeder offerings.

Hank got out of the pen again, but this time rolled in something that really stank.


Monday, May 30, 2011

Memorial Day 2011




Four Days of relaxation at the cabin. Wow what a nice time. Weather was a mixed bag, cold, rain, hot, sunny. Typical Michigan I guess. We got the woodstove working and had two fires in it, one for testing, and one because it was in the upper 40's on Saturday. We also found we can cook on the top and so we made fresh rolls and heated up our brats and sausages.

Lot of work got done, not too many pictures though. The stairway was framed in and we hung 3 of the 4 sheets of drywall inside the stairway. Next is the stringers and steps up to the loft. We framed in the wall-hallway section- pretty time intensive with all the angles and such involved.

Emily helped with the tree fort and the picture shows up putting the initial flooring. Next step is rest of flooring and then the railing so kids can play on it.

Pretty mellow time.

Sunday, May 8, 2011

May 7-8 weekend




SPRING has SPRUNG!!!! What a beautiful weekend we had. PERFECT weather.

Saturday we spent working on the wall layouts and tightening up the floor joists in the loft. Nothing to photo as not much changed. We are ready for walls to go up and next time we work on the place that will get done.

Sunday we switched gears and began our clubhouse project. Kids wanted a tree house to go with the swing set. This is pretty much the same as building a house project so the day was spent on that.

Saturday, April 30, 2011

April updates










Well plenty of work this month, not much posting. We finished the floor joists for the loft and began the center wall that will support them. This picture is from the front door. We also got the stairway hole framed in and ready for stairs.








This picture is from the "front of the cabin" ( most people would say from the back). The area to the right will become a bedrooom soon.

Saturday, March 12, 2011

little fire but fire nonetheless March 12th




Well it's still Winter up here and once again we are working on the woodstove. Today we had all the tools AND the correct seals. Got most of the pieces installed, sealed and screwed into place. Enough was assembled that we lit off a firestarter to see the flame in the stove. Small victories.

The other picture is of the best behaved character today, good ole "LC" also known as hunter. Good ole boy just wanted to sleep off his chicken skin and gristle lunch.....

And the other picture is the Hub now closed. Very sad in my opinion. Little market was so convenient and they had raisin biscuits. Oh well not everything works out as planned. Hopefully the meat market survives.

Saturday, February 26, 2011

Feb. 26th


Cabin was a bracing 20 degrees when we arrived. We delivered our woodstove and made tea on the gas stove. Refilled the squirrel feeder and sat around figuring out the stove for about an hour. We need a 45 degree pipe to connect to the outdoor chimney.

No snow on the roof, the 12 inches we got missed the area I guess.

Remodelling season is getting close!!!!